In the context of the current thread, I'd say that's fair. If you're talking urban infrastructure, my understanding is that things are good until the existing (fairly large) conduits fill up, and then everything stops until someone digs up the street for blocks and blocks.
Do you happen to know, for these long conduits is it typical to do a solid run or to put access panels at regular intervals? If you're running a new cable are you actually trying to run a 1km snake through a pipe, a 100m snake 10 times, 50m x20, or something in between?.
I've never seen anyone run a 1km cable, but I've seen buildings be rewired with tens of kilometers of new cables a couple times.
Do you happen to know, for these long conduits is it typical to do a solid run or to put access panels at regular intervals? If you're running a new cable are you actually trying to run a 1km snake through a pipe, a 100m snake 10 times, 50m x20, or something in between?.
I've never seen anyone run a 1km cable, but I've seen buildings be rewired with tens of kilometers of new cables a couple times.